PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed conduit above the Search room 144 Facing South.jpg Layout for Stair -3 block work Facing North.jpg Started connecting the copper piping to the 3rd floor VAV boxes Facing North.jpg Started connecting the copper piping to the 3rd floor VAV boxes Facing South.jpg VAV Boxes at the 2nd floor.jpg Welding black iron duct work at the 4th floor Facing South.jpg
Previous pageNext page VAV Boxes at the 2nd floor
VAV Boxes at the 2nd floor